Saturday, February 16, 2008

Fuselage Carry-through

Fuselage bulkhead F-905 is the anodized center section- It was match drilled at the factory to accept the wing spar bolts. It has been completed- the uprights, web stiffeners, and cover plates( on the far side, can't see in this photo) have been primed and riveted. Also, since it is easier to do now, the control column has been bolted up as shown- those are the left and right control sticks. Also the wooden block are placeholder for the wing spars, with a relatively precise thickness.

No comments: